Product Description
Parts Connect Sequencer part number PCQ107.
24 Volts
2 DPST-1 SPST Sequencers
1 Timing / 1 Switch
Off 1-160 Seconds
On 1-160 Seconds
PSQ Models are Direct Replacement for Most Fan / Heat Sequencing Functions.
Terminal Markings are Equivalent to Competitive Types.
Replacement for Numbers:
Diversitech DGS107, Honeywell R8330D1039, Klixon 51172-131-5, Mars 33848, Napco NS107, Robertshaw  611-007, Supco Q107, White Rodgers 24A34-14, York  525-37328-000.
COMBINED LOAD RATING TABLE
(ALL MODELS)
30A @ 240 VAC  TOTAL,
23A Non-Inductive + 7 FLA
/ 42 LRA
Inductive,
ON Time: Elapsed time to make contacts after
heater is energized (min. to max.)
OFF Time: Elapsed time to break contacts after
heater is de-energized (min. to max.)
M1-M2 and M3-M4 are always first switches
to turn ON and last to turn OFF. All other
switches are random ON and random OFF
NOTE
: Underwriters Laboratories requires a
fan interlock circuit to insure the blower 
remains operating whenever more than one 
sequencer is used. 
The fan interlock should 
be the M1/ M2
contacts of the second or third sequencer.
All M1/ M2
contacts are wired to the blower 
motor so that any sequencer that is energized 
will keep the blower ON.
rev92816a
 
         
                     
                     
                     
                     
                     
                     
             
             
             
             
             
            